MOFCOM-registered forwarder · Founded in 2021 · Registered capital RMB 5 million · Xi'an 中文 | English | Русский | فارسی WhatsApp:+8618092829394 | Email:info@ydxtrans.com

Rail LCL

Consolidation warehouse in Xi'an, rated by cubic metre. Moscow and St. Petersburg via Manzhouli; Tehran LCL on a regular schedule from June 2026.

Rated by CBM Xi'an warehouse Moscow / St. Petersburg / Baku / Tehran

LCL from China to Moscow

LCL rail China to Moscow via Manzhouli: 18-25 days station to station to Selyatino, 1 CBM = 500 kg. DAP - duty/VAT in consignee's name.

View lane →

St. Petersburg Russia LCL

Rail LCL from China to St. Petersburg via Manzhouli: 25-30 days to Shushary station, one dedicated lane, mixed loading and deconsolidation on arrival.

View lane →

Shenzhen into Russia LCL

Shenzhen cargo is picked up into the Xi'an LCL warehouse. Moscow 18-25 days, St. Petersburg 25-30, after Xi'an departure.

View lane →

Shanghai into Russia LCL

Shanghai cargo is picked up into the Xi'an LCL warehouse. Moscow 18-25 days, St. Petersburg 25-30, after Xi'an departure.

View lane →

LCL shipping to Baku

LCL shipping to Baku from our own Xi'an warehouse: 1–2 departures weekly, 20–25 days station to station on the Trans-Caspian corridor, no Russia transit.

View lane →

China to Baku LCL

China to Baku LCL groupage consolidated in our own 6,000 m² Xi'an warehouse, then the Trans-Caspian route with no Russia transit.

View lane →

Xi'an to Tehran rail LCL

Rail groupage from China to Tehran on the China-Iran railway: pickup nationwide, our own Xi'an warehouse, weekly consolidation, 25-35 days to Aprin dry port.

View lane →

Europe rail LCL

Rail LCL to Europe from our Xi'an consolidation warehouse, rated per cubic metre at 1 CBM = 500 kg, delivery to Germany and Poland.

View lane →

The LCL warehouse is in Xi'an

Consolidation is in Xi'an, 6,000 m². Moscow LCL is 18–25 days to Selyatino via Manzhouli / Zabaykalsk. St. Petersburg is 25–30 days to Shushary. Baku LCL runs 1–2 fixed departures weekly, 20–25 days station to station on the Trans-Caspian corridor — see Xi'an to Baku LCL. Tehran LCL clears at Aprin dry port in 25–35 days — see Xi'an to Tehran LCL. Days start when the train leaves Xi'an.

Shenzhen and Shanghai are pickup cities, not a second warehouse. The domestic leg is its own line. See Shenzhen and Shanghai.

Rating is by cubic metre. The minimum is confirmed at booking. Lithium batteries, goods with batteries and dangerous goods do not go in the LCL box. A near-full load should move as FCL.

LCL lane pages

Xi'an to Moscow LCL (Selyatino), Xi'an to St. Petersburg LCL (Shushary), Xi'an to Baku rail LCL (Trans-Caspian, 20–25 days, no Russia transit), Xi'an to Tehran rail LCL (Aprin dry port, 25–35 days). General destination pages: Baku, Tehran. Pickup cities: Shenzhen, Shanghai.

If your volume is past the LCL break-even, switch to FCL on the Xi'an to Baku or Xi'an to Tehran rail freight page.

Questions

Which cities does rail LCL cover?

Moscow, St. Petersburg and Tehran. The consolidation warehouse is in Xi'an and cargo is rated by cubic metre.

What is the LCL transit time?

Moscow 18–25 days, St. Petersburg 25–30 days. Tehran LCL runs on a regular schedule from June 2026.