Is there a railway from China to Iran?

Yes. Containers move from China to Tehran by rail. They do not stay on one wagon from the loading terminal to the Tehran yard. The box crosses third countries, changes gauge, and on one of the three corridors it also crosses the Caspian by ferry. The transit we are actually running is 25–35 days, not a two-week express.

Three corridors 25–35 days Aprin dry port Standard–broad–standard gauge
Updated October 2026

The questions this page is here to answer

There is a rail connection, and FCL cargo can be delivered in Tehran. Kilometre totals published online do not fit all three corridors at once, so this page does not state a single distance. The only transit figure used here is the one in operation: 25–35 days to Aprin dry port. That range already includes gauge-change queues. It is not a paper timetable.

Departures can be compared from Xi'an, Wuhan, Zhengzhou, Chengdu, Urumqi and Jinan. Part loads go on LCL to Tehran, with the same 25–35 day range.

How the three corridors differ

China to Iran railway route map: the Sarakhs, Incheh Borun and Trans-Caspian (Aktau–Anzali) corridors
Schematic map of the three China–Iran rail corridors (not to scale)
CorridorPathWhat changes
Aktau–AnzaliAcross Kazakhstan to Aktau, Caspian ferry to Anzali, then rail to TehranOne sea leg; the ship connection moves the total
SarakhsOut via Khorgos, across Kazakhstan and Turkmenistan, broad-to-standard gauge change at Sarakhs, then Mashhad to AprinAll rail, no ferry
Incheh BorunSame countries, gauge change at Incheh Borun opposite Akyayla / EtrekAll rail; one of the two corridors named by the Iranian side

All three finish at the same customs point: Aprin, about 21 km from central Tehran. The border stations do the entry pre-check and the gauge change. The import entry itself is at Aprin. Corridor pages: Aktau–Anzali, Sarakhs, Incheh Borun.

Khorgos Gateway - the transloading yard at the China-Kazakhstan border
Khorgos Gateway transloading yard

Why the gauge changes twice

China is 1,435 mm. Kazakhstan and Turkmenistan are 1,520 mm. Iran returns to standard gauge. An all-rail corridor therefore changes gauge twice: once onto the broad-gauge network, and once back to standard gauge inside Iran.

The container is lifted onto a wagon of the other gauge. The cargo is not unloaded piece by piece. It is routine border work, and it is still an extra lift. Packaging and bracing have to be designed for more than one lift. Fragile cargo, high-value equipment and loads with a high centre of gravity should be declared at booking; road may be the cleaner option if lifts are the risk.

When rail is the wrong tool

Rail fits FCL that can live with 25–35 days. Road via Khorgos is 10–15 days and is the first check when the date is shorter than that. Ocean from Taicang or Zhuhai to Bandar Abbas is 15–25 days at sea and about 25–35 door to door; if the Strait is restricted, that date is confirmed separately.

If you need Iranian duty paid and the box delivered to a warehouse, use Iran DDP door delivery. If the box should cross Kazakhstan but stop in Baku or Georgia, that is a different corridor: the Trans-Caspian corridor.

Can you ship a full container by rail? How much does one carry?

Yes. FCL is the main mode on the China–Iran corridor, and 20GP, 40GP and 40HQ are all bookable. The binding constraint is weight, not container size.

25.5 tonnes per box — a 40-footer is not more generous than a 20-footer

Cargo net weight is capped at 25.5 tonnes per container, the same for 20GP and 40HQ, excluding tare. This differs from ocean practice, where a 40HQ often loads past 26 tonnes. The reason is specific to rail: the corridor runs on 1520 mm gauge, containers are transhipped at the border, and weight is calculated against wagon axle load. The limit comes from the line, not from the box. Overweight cargo is devanned and reloaded at the border.

ContainerInternal volumePractical loadSuits
20GP33.2 CBM28–30 CBMDense cargo above 0.88 t/CBM
40GP67.7 CBM58–60 CBMGeneral cargo
40HQ76.4 CBM66–68 CBMLight cargo below 0.38 t/CBM

Cargo between 0.38 and 0.88 t/CBM usually ships cheaper in a 40HQ: the box reaches the full 25.5 tonnes with its volume nearly used up. Only above 0.88 t/CBM does a 20GP stop you paying for air.

How the capacities translate into a loading plan, and how departure and payment rules work, is on China to Iran FCL rail freight.

FAQ

Is there a direct train from China to Iran?

There is a rail route. There is not a train that keeps the same wagon from a Chinese terminal to the Tehran yard without a gauge change and without crossing a third country. The container is handed over, transferred on the broad-gauge section, and enters Iran on standard gauge. The customs point is Aprin.

How many days does it take now?

25–35 days. That is the transit under the current queues, not the theoretical running time. Each booking is given an estimate for that departure, and the delivery date should keep a buffer.

How many kilometres is the railway?

The three corridors do not share one path, and one of them includes a ferry, so there is no single distance we will put on a booking. The comparison that matters is the border, the number of lifts and the days on that week’s plan.

What should not go by rail?

Cargo that must arrive inside two weeks should be checked on the road lane first. Dangerous goods and lithium batteries need an MSDS and a transport report before anyone confirms the train. Ordinary FCL that also needs DDP can move by rail.

Tell us the origin city, the box type and whether 25–35 days is acceptable
The corridor is chosen against space that week | WhatsApp:+8618092829394
Request a quote

Transit times, train schedules and charging rules on this page were last verified on 2026-11-08. Figures are indicative; the rate we confirm in writing governs.

Send the lane, get a rate today