We were an early operator on China-Europe rail, and the Europe book is deep. We run full-timetable block trains Xi'an–Duisburg, Xi'an–Budapest, Xi'an–Prague and Zhengzhou–Hamburg, and we cover conventional calls at Milan, Malaszewicze, Munich, Liege, Madrid, Lodz and Belgrade. FCL and LCL, door to door.
Westbound China-Europe Railway Express service leaves China via Alashankou, Khorgos, Manzhouli or Erenhot, crosses Kazakhstan, Russia and Belarus, and enters the Polish and German networks through to the main European hubs. Against ocean freight it cuts transit by more than half. Against air it cuts cost sharply. For most China-Europe trade it is the best balance of time and money.
EW TRANS CO.,LTD was an early operator on China-Europe rail, and the Europe resources are deep. We run two products together. Full-timetable block trains operate to fixed stops, a fixed route, a fixed train number, a fixed schedule and a fixed rate, so arrival and departure hold. Conventional block trains cover more cities and more flexible departures, and they take the overflow when timetable space is tight. Between the two, the cargo still has a workable plan across seasons and delivery dates.
| Item | Detail |
|---|---|
| Indicative transit | Full-timetable block trains: Xi'an to Duisburg 16–18 days, Xi'an to Budapest and Prague 18–20 days, Zhengzhou to Hamburg 14–16 days. Conventional block trains about 12–22 days, depending on the border and the destination station |
| Main origins | Xi'an, Zhengzhou, Chengdu, Yiwu (chosen closest to the cargo) |
| Exit borders | Alashankou / Khorgos (main west corridor), Manzhouli, Erenhot |
| Equipment | 20GP, 40GP, 40HQ; FCL, LCL and selected special equipment |
| Scope | Domestic collection, export customs declaration, block-train transport, destination import customs clearance, final delivery across Europe |
A full-timetable block train runs on five fixed elements: fixed stops, a fixed route, a fixed train number, a fixed schedule and a fixed rate, with the Chinese, broad-gauge and European timetables joined up. Departure and arrival are known, so production, sales and warehousing can be planned against them and cash is not tied up waiting. We operate four full-timetable routes:
| Origin | European station | Indicative transit | Notes |
|---|---|---|---|
| Xi'an | Duisburg (Germany) | 16–18 days | One of three full-timetable routes from Xi'an |
| Xi'an | Budapest (Hungary) | 18–20 days | Central and Eastern European hub, covering Hungary and neighbouring markets |
| Xi'an | Prague (Czech Republic) | 18–20 days | Stable Central and Eastern European schedule, suited to machinery and consumer goods |
| Zhengzhou | Hamburg (Germany) | 14–16 days | The first full-timetable block train in China with a direct Hamburg call |
Transit figures are normal operating results. The actual departure follows the current schedule, border throughput and the booking confirmation. Xi'an is the first city in China to run three full-timetable routes on a regular basis, with a stable pattern of six westbound and three eastbound departures a week.
Alongside the timetable product we have long operated conventional China-Europe routes into southern Europe, Central and Eastern Europe and the Iberian Peninsula, with more flexibility on schedule and space:
| Route | Country | Indicative transit | Notes |
|---|---|---|---|
| Xi'an → Milan | Italy | About 18–22 days | Main southern Europe lane, with final delivery across Italy |
| Xi'an → Malaszewicze | Poland | About 12–15 days | Europe's largest gauge-change hub, for onward moves across the EU |
| Zhengzhou → Munich | Germany | About 16–20 days | Southern German hub, covering Austria and Switzerland |
| Zhengzhou → Liege | Belgium | About 18–22 days | Western European gateway; convenient for Benelux and northern France |
| Yiwu → Madrid | Spain | About 18–22 days | One of the classic long-distance China-Europe routes, covering the Iberian Peninsula |
| Chengdu → Lodz | Poland | About 12–16 days | Central and Eastern European distribution base, well placed for central Poland |
| Xi'an → Belgrade | Serbia | About 18–23 days | Balkans corridor, covering Serbia and neighbouring markets |
Conventional transit moves more with border gauge change and how the departure is slotted. The ranges above are indicative and are confirmed at booking. If your city is not listed, tell us — European on-carriage covers the EU.
| Border | Corridor | When it fits |
|---|---|---|
| Alashankou | West corridor | The main China-Europe border, onto the Kazakhstan–Russia–Europe main line |
| Khorgos | West corridor | The alternative to Alashankou when one border is congested |
| Manzhouli | East corridor | Through Russia to Europe; suited to northeast and north China and some European stations |
| Erenhot | Central corridor | Via Mongolia and Russia into Europe; the nearby exit for central China origins |
Border and schedule are built into the same plan, against your origin, the destination station and how the borders are running that week. Congestion risk is not left with the shipper.
A full-timetable block train runs to fixed stops, a fixed route, a fixed train number, a fixed schedule and a fixed rate. The Chinese, broad-gauge and European timetables are joined, so departure and arrival are set. Running time is on average more than 30% shorter than a conventional train on the same path. It is the product for time-sensitive cargo.
Full-timetable block trains: Xi'an to Duisburg 16–18 days, Xi'an to Budapest and Prague 18–20 days, Zhengzhou to Hamburg 14–16 days. Conventional trains take about 12–22 days, depending on the border, the station and the departure. Confirmed transit is the figure on the booking.
Yes. We work with the main China-Europe platforms in Xi'an, Zhengzhou, Chengdu and Yiwu, and we pick the origin closest to the cargo so domestic trucking and consolidation cost less.
Full-timetable block trains cover Duisburg, Hamburg, Prague and Budapest. Conventional routes cover Milan, Malaszewicze, Munich, Liege, Madrid, Lodz and Belgrade, and European final delivery covers the EU.
Yes. FCL (20GP / 40GP / 40HQ) and LCL are both handled. Door to door covers domestic collection, export customs declaration, the block train, destination import customs clearance and final delivery across Europe.
The rate moves with the departure, equipment, fuel surcharge and peak-season space. Use WhatsApp:+8618092829394 or enquire online for the current breakdown, covering domestic pickup, export customs declaration, the linehaul and arrival charges.
Transit times, train schedules and charging rules on this page were last verified on 2026-11-13. Figures are indicative; the rate we confirm in writing governs.
Origin and email are enough - the rest can follow later. We reply in writing so you keep everything on record.