China-Europe compared: rail 14-22 days, ocean 30-45 days, air 3-7 days, with cost bands, volume breakpoints and how to choose.
Rail 14–22 days, ocean 30–45, air 3–7. Each one is a terminal-to-terminal figure: station to station, port to port, airport to airport. Door to door adds the inland legs at both ends — roughly 4–7 days for rail, 8–15 for ocean, 2–4 for air. Most quote comparisons that appear to contradict each other are simply measuring different segments of the same route.
Rail: pickup and consolidation 2–4 days, the run itself 14–22 days (14–20 on full-timetable trains, 12–22 on conventional services), clearance and delivery at destination 2–5 days. Ocean: cut-off and waiting for the vessel 3–7 days, sea leg 25–35, import clearance and inland haulage 5–10. Air: export handling 1–2, flight 1–2, import clearance 1–3.
Split open this way, the gap between rail and ocean sits at the two ends rather than at sea. The part of rail that moves is the gauge-change border. Air time is rarely flight time; it is waiting for space and clearing customs.
Rail FCL is priced per container (20GP, 40GP, 40HQ) with a 25.5 t net limit that applies equally to 20ft and 40ft. Rail LCL is priced per cubic metre at 1 chargeable CBM = 500 kg, whichever is greater, one CBM minimum. Ocean is also per container, but destination charges multiply: terminal handling, documentation, storage, plus a deconsolidation charge on LCL. Air is per kilo, with volumetric weight applied to light cargo.
To compare fairly, convert every quote to door to door and add destination charges, clearance and final delivery. Skip that step and ocean always looks cheapest.
Rail for replenishment that has to land inside 25–35 days, and for mid-to-high value machinery or consumer goods. Ocean for volume above 20 t per container and a schedule that can absorb 40 days. Air for samples, urgent shipments, and cargo that is very high value or perishable. Rail LCL from one CBM when the shipment is under a container but cannot wait for ocean. To Iran there is also a road option out of Khorgos, 10–15 days port to port, covered on the road freight page.
Border queues: gauge-change capacity at Alashankou and Khorgos is a hard limit, and peak season turns 14 days into 20 or more. Sailing schedules and strait conditions: ocean transit is set by the carrier's rotation and by the passage situation, not by vessel speed. Documentation: a wrong HS classification or a missing declaration element can hold cargo at arrival longer than the voyage itself took.
Ranges, not single dates. China–Europe rail 14–22 days, Iran 25–35 days station to station and 28–40 door to door, ocean 30–45. For a hard deadline, add 5–7 days on top of the upper bound and work backwards from it; we confirm the booking and cut-off dates on that basis. Cut-off is three days before departure.
15–20 days faster station to station (rail 14–22, ocean 30–45). Door to door the gap narrows to 10–15 days, because ocean has longer inland legs at both ends.
On the same European lane, rail unit cost runs between one fifth and one third of air, depending on weight and cargo density. Light cargo is better priced per container or per cubic metre; a genuine emergency still belongs on a plane.
Because transit is the sum of train scheduling, border gauge change and destination clearance, and each of the three moves. A range with the buffer already inside it is closer to reality than one promised day, and it lets you plan production and sales backwards from a date you can defend.
Transit times, train schedules and charging rules on this page were last verified on 2026-11-15. Figures are indicative; the rate we confirm in writing governs.