Shanghai is where most of the Iran enquiries we receive actually start: the factory is in Jiangsu or Zhejiang, the trading company sits in Shanghai, and the question is whether the box has to go by sea through Hormuz at all. It does not. Cargo is trucked or fed to the Xi'an or Zhengzhou platform, railed through Khorgos, and cleared at Aprin dry port in Tehran. Door to door: 28–40 days, of which 3–5 days is the domestic leg out of Shanghai.
Yangshan and Waigaoqiao will always be the cheaper way to move 40 tonnes of low-value freight. On the Iran lane the calculation changed: ocean space into the Gulf is restricted, and what is left is priced and scheduled week by week. Rail from Shanghai is the option that holds a delivery date. Send the commodity and volume and we price both, side by side, in the same reply.
There is no loaded block train leaving a Shanghai container terminal for Tehran. What exists is a two-part move: a domestic leg from the Shanghai area to an inland rail platform with Iran space, then the international block train. We run both parts on one through rate, one booking, one thread of correspondence — the handover between truck and rail is ours, not yours.
| Item | Detail |
|---|---|
| Lane | Shanghai (and the Yangtze Delta) → Tehran, Aprin dry port |
| Boarding platform | Xi'an International Port, Zhengzhou Putian, Hefei or Jinan — whichever releases space for your cargo-ready date |
| Exit border | Khorgos (mainly) or Alashankou |
| Iran entry | Sarakhs, Incheh Borun, or the Aktau–Anzali Caspian service |
| Domestic leg | 3–5 days Shanghai → inland platform, by truck or by domestic container train |
| Rail transit | 25–35 days station to station; 28–40 days door to door |
| Gauge changes | Standard to broad at China–Kazakhstan; broad to standard at the Turkmen–Iran border |
| Equipment | 20GP / 40GP / 40HQ, SOC on request; LCL from 1 CBM |
| Clearance | Import clearance at Aprin dry port, Tehran. DAP or DDP |
The 25–35 day rail figure runs from loading at the departure platform, not from your gate. Add the domestic leg when you plan backwards from an Iranian delivery date.
For twenty years the answer to "China to Iran" was a container into Bandar Abbas and 1,300 km of trucking up to Tehran. That routing still exists. What changed is the risk around it.
With traffic through the Strait of Hormuz disrupted, Gulf services have been suspended, restricted or rerouted, and some cargo discharges at outer ports such as those in Oman before moving on. War-risk surcharges come and go. For a Shanghai shipper the practical effect is that the ocean quote you receive on Monday may not be bookable on Thursday, and the arrival window is a range nobody will commit to.
A block train has a booking cut-off and a departure. That is a firmer commitment than a vessel slot in the current market, and it lands in Tehran rather than 1,300 km away at a Gulf port. For a machinery shipment, a spare-parts line or a project cargo tied to a site schedule, the difference is not the transit time — it is that one date is actionable and the other is not.
The domestic leg is a fixed, known cost and a known three to five days. Compare it with the alternative: a 30–40 day sea voyage plus one to two weeks of Iranian import clearance at Bandar Abbas plus the inland haul. On most Iran cargo the rail door-to-door figure is competitive, and on high-value or deadline-bound cargo it is not close.
Three routes are in daily use. Which one you get depends on the commodity, the volume and — more than anything else — where space exists in the week your cargo is ready.
| Route | How it works | Fits |
|---|---|---|
| Truck direct to Xi'an | Container collected at your factory in Shanghai, Suzhou, Wuxi or Nantong, driven 1,400 km to the Xi'an consolidation warehouse, then stuffed and railed | FCL of any size; cargo that must not be transloaded twice; tight cut-offs |
| Domestic container train | Cargo railed from the Shanghai area to Xi'an or Zhengzhou as a domestic movement, then transferred to the international block train | Volume lots where the domestic rail rate undercuts road; cargo that can wait two extra days |
| Feeder to a Yangtze platform | Barged up the Yangtze to Wuhan or railed to Hefei / Jinan, loading where Iran space is available | Hubei, Anhui and Jiangsu inland cargo; weeks when Xi'an is full |
The instinct is always "the cheapest leg wins". In practice the expensive mistake is the other one: holding cargo at a platform for three weeks waiting for space on the cheapest routing. A slightly dearer domestic leg that catches an earlier departure is almost always the better commercial answer, and we will say so when we see it.
What we need from you is four things: pickup address, commodity (and whether it is battery-powered or otherwise regulated), volume or weight, and the delivery address in Iran. Everything else we can work out.
| Rail via Xi'an / Zhengzhou | Sea via Bandar Abbas | |
|---|---|---|
| Transit | 28–40 days door to door | 30–45 days port to door in the current market, with wide variance |
| Booking certainty | Cut-off and departure fixed; space allocated per block train | Space restricted; sailings suspended or rerouted at short notice |
| Where it lands | Aprin dry port, Tehran — clearance and delivery in one place | Bandar Abbas, then 1,300 km of Iranian domestic haulage |
| Best for | Machinery, project cargo, batteries, electronics, deadline-bound freight | Very heavy, low-value, non-urgent bulk where the ocean rate dominates |
| Weak point | Border queue at the gauge change; capacity is finite | Hormuz risk, war-risk surcharges, unstable schedules |
There is also road: Khorgos by truck, roughly 10–15 days to Tehran. It is the fastest option and the most expensive per tonne, and it is the right answer for a 300 kg urgent consignment and the wrong one for 20 tonnes. We quote all three when the cargo profile is unclear.
Cargo net weight is capped at 25.5 tonnes per container, identical for 20GP and 40HQ, excluding tare. A 40-footer that takes 26 tonnes by sea takes 25.5 here, because the constraint is wagon axle load and the gauge change, not box strength. Overweight boxes are devanned at the border and reloaded — at the shipper's cost, with the delay that implies. Give us weighed net weight, not a gross figure minus an assumed tare.
| Cargo density | Container | Why |
|---|---|---|
| below 0.38 t/CBM | 40HQ | Volume runs out long before the weight ceiling |
| 0.38–0.88 t/CBM | usually 40HQ | Reaches 25.5 t with the volume nearly used up |
| above 0.88 t/CBM | 20GP | A 40-footer at 25.5 t would still be half empty — you pay for air |
Departures to Iran are not on a fixed weekly pattern: capacity is planned per block train and released close to the departure date. What we control is which platform and which corridor you are placed on, and we hold your slot against your cargo-ready date rather than asking you to guess. The one deadline that is fixed: documents and cargo must be with us three days before dispatch.
Freight is payable in full before departure, on booking confirmation. Not because we like it that way — rail operators require it, and a slot without prepayment is a slot someone else takes.
Shanghai's Iran enquiries skew small — 3 to 12 CBM of machinery parts, textile accessories, electronic components, samples for a Tehran distributor. Those ship as groupage: collected in Shanghai, consolidated at our own 6,000 m² warehouse in Xi'an, stuffed and cleared for export, then railed to Aprin.
Charging is W/M: 1 CBM = 500 kg, minimum 1 CBM. Compare the actual volume with weight ÷ 500 and you are billed on the larger number. A 4 CBM shipment weighing 1.2 tonnes bills as 4 CBM; a 2 CBM shipment weighing 1.6 tonnes bills as 3.2 CBM. Light, bulky cargo pays on volume; dense cargo pays on weight. This is the single most common source of invoice surprise on LCL to Iran, so we state both numbers before booking.
Consolidation runs roughly once a week from Xi'an. Once your cargo is in the warehouse it waits for the box to fill, not for a vessel. Full LCL detail and the cut-off rules are here.
The recurring commodities on this lane are machine tools and spare parts, textile machinery and accessories, chemical raw materials, PVC and adhesive products, LED and lighting components, solar mounting hardware, and lithium-battery products. Three of those need attention before booking, not after:
Lithium cells and battery-containing equipment are Class 9 dangerous goods by rail. You need a UN38.3 test summary, an MSDS, and often a classification report; equipment with batteries installed ships more easily than loose cells. Many forwarders will not touch it. We take it on specific corridors with the paperwork in order — see the battery shipping guide.
Non-hazardous is a claim that has to be evidenced, not asserted. If the MSDS shows a UN number, the shipment is regulated and needs a licensed packer, proper packaging and a dangerous-goods declaration. Sending it as general cargo and hoping is how containers get held at Khorgos for a month.
ISPM 15 with a legible IPPC mark. This is the item most often picked up when Sarakhs opens a box at random, and re-treatment at the border is slow and expensive.
Documents normally required: commercial invoice, packing list, SMGS international rail consignment note, certificate of origin, and — depending on the goods — a pre-shipment inspection certificate. Your Iranian consignee additionally needs a valid import licence and a VÖEN tax number for clearance; the Iran customs page sets out what gets checked.
28–40 days door to door. Three to five of those days are the domestic leg from Shanghai to the inland platform; the rail leg itself is 25–35 days station to station and moves with the departure schedule and the border queue. We confirm the expected figure for your week at booking.
No. No loaded block train departs a Shanghai container terminal for Tehran. The move is a domestic leg to Xi'an, Zhengzhou, Hefei or Jinan, then the international block train through Khorgos. It is one booking and one through rate, but it is physically two legs and you should know that before you plan a cut-off.
Yes — Suzhou, Wuxi, Changzhou, Nantong, Ningbo, Hangzhou and the wider Yangtze Delta are all routine pickups on this lane, quoted per address. Zhangjiagang and Changzhou cargo usually loads through the same platform as Shanghai.
Pickup in Shanghai, warehouse receiving and stuffing, export declaration, the domestic leg, rail linehaul with gauge-change handling, and either DAP delivery or DDP with Iranian duty and VAT paid. Domestic and rail legs are itemised separately so you can see what each part costs rather than one blended figure with pickup buried inside.
Yes. LCL starts at 1 CBM, billed W/M at 1 CBM = 500 kg. Below about 10–13 CBM groupage is normally cheaper than a 20GP; above that the arithmetic flips and we will tell you so rather than sell you the more expensive option. The break-even calculation is set out here.
Yes. Under DAP your consignee clears and pays duty and VAT. Under DDP our partner broker files with IRICA at Aprin dry port, pays duty and VAT, and we complete delivery. Which mode applies must be fixed before booking, because both the responsibility and the payer differ.
Transit times, train schedules and charging rules on this page were last verified on 2026-11-10. Figures are indicative; the rate we confirm in writing governs.
Origin and email are enough - the rest can follow later. We reply in writing so you keep everything on record.